CORC

浏览/检索结果: 共2条,第1-2条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor's Cash Flow Gap under Random Activity Duration 期刊论文
IEEE ACCESS, 2018, 卷号: 6, 页码: 30547-30558
作者:  Ning, Minjing;  He, Zhengwen;  Wang, Nengmin;  Liu, Renjing
收藏  |  浏览/下载:3/0  |  提交时间:2019/11/26
Metaheuristics for multi-mode cash flow balanced project scheduling with stochastic duration of activities 期刊论文
AUTOMATION IN CONSTRUCTION, 2017, 卷号: 81, 页码: 224-233
作者:  Ning, Minjing;  He, Zhengwen;  Jia, Tao;  Wang, Nengmin
收藏  |  浏览/下载:9/0  |  提交时间:2019/11/26


©版权所有 ©2017 CSpace - Powered by CSpace