CORC  > 西安交通大学
Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor's Cash Flow Gap under Random Activity Duration
Ning, Minjing; He, Zhengwen; Wang, Nengmin; Liu, Renjing
刊名IEEE ACCESS
2018
卷号6页码:30547-30558
关键词cash flow gap random activity duration Proactive and reactive project scheduling optimization model metaheuristic algorithm
ISSN号2169-3536
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2921354
专题西安交通大学
推荐引用方式
GB/T 7714
Ning, Minjing,He, Zhengwen,Wang, Nengmin,et al. Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor's Cash Flow Gap under Random Activity Duration[J]. IEEE ACCESS,2018,6:30547-30558.
APA Ning, Minjing,He, Zhengwen,Wang, Nengmin,&Liu, Renjing.(2018).Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor's Cash Flow Gap under Random Activity Duration.IEEE ACCESS,6,30547-30558.
MLA Ning, Minjing,et al."Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor's Cash Flow Gap under Random Activity Duration".IEEE ACCESS 6(2018):30547-30558.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace