Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints
Jipeng Wang; Hesuan Hu; Chunrong Pan; Yuan Zhou; Liang Li
刊名IEEE/CAA Journal of Automatica Sinica
2020
卷号7期号:3页码:776-789
关键词Cluster tools multiple wafer types scheduling semiconductor manufacturing wafer fabrication
ISSN号2329-9266
DOI10.1109/JAS.2020.1003150
英文摘要Accompanying the unceasing progress of integrated circuit manufacturing technology, the mainstream production mode of current semiconductor wafer fabrication is featured with multi-variety, small batch, and individual customization, which poses a huge challenge to the scheduling of cluster tools with single-wafer-type fabrication. Concurrent processing multiple wafer types in cluster tools, as a novel production pattern, has drawn increasing attention from industry to academia, whereas the corresponding research remains insufficient. This paper investigates the scheduling problems of dual-arm cluster tools with multiple wafer types and residency time constraints. To pursue an easy-to-implement cyclic operation under diverse flow patterns, we develop a novel robot activity strategy called multiplex swap sequence. In the light of the virtual module technology, the workloads that stem from bottleneck process steps and asymmetrical process configuration are balanced satisfactorily. Moreover, several sufficient and necessary conditions with closed-form expressions are obtained for checking the system’s schedulability. Finally, efficient algorithms with polynomial complexity are developed to find the periodic scheduling, and its practicability and availability are demonstrated by the offered illustrative examples.
内容类型期刊论文
源URL[http://ir.ia.ac.cn/handle/173211/42988]  
专题自动化研究所_学术期刊_IEEE/CAA Journal of Automatica Sinica
推荐引用方式
GB/T 7714
Jipeng Wang,Hesuan Hu,Chunrong Pan,et al. Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints[J]. IEEE/CAA Journal of Automatica Sinica,2020,7(3):776-789.
APA Jipeng Wang,Hesuan Hu,Chunrong Pan,Yuan Zhou,&Liang Li.(2020).Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints.IEEE/CAA Journal of Automatica Sinica,7(3),776-789.
MLA Jipeng Wang,et al."Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints".IEEE/CAA Journal of Automatica Sinica 7.3(2020):776-789.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace