CORC

浏览/检索结果: 共18条,第1-10条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Cascade hydraulic power plant group east-to-west dispatching market combined trading strategy optimizing method, involves performing non-linear planning process to solve power generation dispatching model in intra-provincial market. 专利
申请日期: 2018-01-01, 公开日期: 2018-05-11
作者:  CHENG C MIAO S SHEN J CAO R ZHANG C
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Coal fired power plant rotation air preheater of improvement 专利
申请日期: 2016-01-01,
作者:  CONG XINGLIANG;  TANG QUAN;  XU YONGYI;  HUANG QISHUN;  CHENG JING
收藏  |  浏览/下载:7/0  |  提交时间:2019/04/19
动力电池自动拆解回收设备 专利
专利类型: 实用新型, 专利号: CN204793105U, 申请日期: 2015-11-18, 公开日期: 2015-11-18
作者:  何挺;  黄敦新;  沙亚红;  吴文峰;  高丙坤
收藏  |  浏览/下载:154/0  |  提交时间:2015/11/26
Hydropower station energy group optimizing period scheduling method, involves determining power station energy precision value, and estimating maximum power generation range of cascade hydraulic power plant group. 专利
申请日期: 2015-01-01, 公开日期: 2015-04-08
作者:  CHENG C FENG Z NIU W WU X CENG J
收藏  |  浏览/下载:16/0  |  提交时间:2019/12/09
Optimizing method of multi-operation state of thermal power plant, involves establishing thermal power unit group with optimizing module, and optimizing machine state in each period. 专利
申请日期: 2015-01-01, 公开日期: 2015-04-08
作者:  LV Q WANG H YU X ZHANG Z RAO Y LEI
收藏  |  浏览/下载:7/0  |  提交时间:2019/12/09
Power supply electric quantity distribution method for flood water and power grid province adjusting balance enriched power plant, involves calculating development of power generation plan within jurisdiction of plant planned date. 专利
申请日期: 2015-01-01, 公开日期: 2015-03-11
作者:  CAI H CHEN F CHENG C LIAO S LI G LI
收藏  |  浏览/下载:9/0  |  提交时间:2019/12/09
Method for forecasting power generation capacity of small hydropower plant, involves providing mall region water and electricity installation using large area and flow rate value and calculated generated capacity value. 专利
申请日期: 2015-01-01, 公开日期: 2015-04-22
作者:  CAI H CHENG C LIU C LI G SUN Y TU Q
收藏  |  浏览/下载:5/0  |  提交时间:2019/12/09
Nuclear power plant main loop high temperature pipe fatigue prototype monitoring device, has background server connected with external data storage servers, and thermocouple temperature sensor mounted in temperature measuring point of pipe. 专利
申请日期: 2015-01-01, 公开日期: 2015-03-25
作者:  GAO N LI F WU W XU H XU X WEI W
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/09
Cascade hydraulic power plant navigation and multi-target optimization scheduling based mix searching method, involves performing congestion distance calculation operation, and judging whether termination condition is satisfied. 专利
申请日期: 2014-01-01, 公开日期: 2014-09-10
作者:  NIU W CHENG C WU X SHEN J
收藏  |  浏览/下载:8/0  |  提交时间:2019/12/11
Real time complex lower limit cascade hydraulic power plant group optimizing adjusting method, involves defining power generation schedule and power grid electric power balance constraint for hydroelectric power station. 专利
申请日期: 2014-01-01, 公开日期: 2014-11-26
作者:  CHENG C LIAO S LI G WU X SHEN J WAN
收藏  |  浏览/下载:10/0  |  提交时间:2019/12/11


©版权所有 ©2017 CSpace - Powered by CSpace