CORC

浏览/检索结果: 共4条,第1-4条 帮助

已选(0)清除 条数/页:   排序方式:
Random replacement policies to sustain the post-warranty reliability 期刊论文
Journal of Quality in Maintenance Engineering, 2022
作者:  Shang, Lijun;  Qiu, Qingan;  C., Wu;  Y., Du
收藏  |  浏览/下载:31/0  |  提交时间:2022/07/20
The post-warranty random maintenance policies for the product with random working cycles 期刊论文
EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2021, 卷号: 23, 期号: 4, 页码: 726-735
作者:  Shang, Lijun;  Wang, Haibin;  Wu, Cang;  Cai, Zhiqiang
收藏  |  浏览/下载:16/0  |  提交时间:2021/12/17
Chemisorptions of atomic oxygen and its replacement by hydrogen on the diamond (100) surface studied by first principles 期刊论文
Surface Review and Letters, 2006, 卷号: 13, 期号: 1, 页码: 45-49
Z. G. Wang; X. T. Zu; J. L. Nie; H. Y. Xiao
收藏  |  浏览/下载:11/0  |  提交时间:2012/04/14
The replacement of dry heat in generic reliability assurance requirements for passive optical components (EI CONFERENCE) 会议论文
ICO20: Optical Devices and Instruments, August 21, 2005 - August 26, 2005, Changchun, China
Ren X.; Qian L.; Zhang G.
收藏  |  浏览/下载:11/0  |  提交时间:2013/03/25
According to Generic Reliability Assurance Requirements for Passive Optical Components GR-1221-CORE (Issue 2  January 1999)  reliability determination test of different kinds of passive optical components which using in uncontrolled environments is taken. The test condition of High Temperature Storage Test (Dry Test) and Damp Test is in below sheet. Except for humidity condition  all is same. In order to save test time and cost  after a sires of contrast tests  the replacement of Dry Heat is discussed. Controlling the Failure mechanism of dry heat and damp heat of passive optical components  the contrast test of dry heat and damp heat for passive optical components (include DWDM  CWDM  Coupler  Isolator  mini Isolator) is taken. The test result of isolator is listed. Telcordia test not only test the reliability of the passive optical components  but also test the patience of the experimenter. The cost of Telcordia test in money  manpower and material resources  especially in time is heavy burden for the company. After a series of tests  we can find that Damp heat could factually test the reliability of passive optical components  and equipment manufacturer in accord with component manufacture could omit the dry heat test if damp heat test is taken first and passed.  


©版权所有 ©2017 CSpace - Powered by CSpace