已选(0)清除
条数/页: 排序方式:
|
| 明流泄洪洞内闷顶水跃及解决措施的研究 期刊论文 2016, 2016 孙东坡; 曹帅; 张羽; 宋永军; SUN Dongpo; CAO Shuai; ZHANG Yu; SONG Yongjun 收藏  |  浏览/下载:4/0 |
| 下迷宫压力脉动对抽水蓄能机组稳定性的影响分析 期刊论文 2016, 2016 姚泽; 支发林; 阎宗国; 黄青松; 毕慧丽; 王正伟; Yao Ze; Zhi Falin; Yan Zongguo; Huang Qingsong; Bi Huili; Wang Zhengwei 收藏  |  浏览/下载:4/0 |
| Study of coordinated control method based on Generator Units share High-Voltage Variable Frequency Starting of the Pumped Storage Power Station 会议论文 作者: Wang Kunjie; Li Xiaoming; He Le; He Li; Yin Jiayue 收藏  |  浏览/下载:3/0  |  提交时间:2019/12/05
|
| Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station 期刊论文 TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 卷号: 54, 页码: 123-134 作者: Xiao, Ming; Bian, Kang; Liu, Jian; Liu, Zhenping 收藏  |  浏览/下载:12/0  |  提交时间:2018/06/05
|
| Study of Optimization based on the Motor Power and the Auxiliary Power system of the Pumped Storage Power Station 会议论文 作者: Zhang Caijun; He Le; He Li 收藏  |  浏览/下载:9/0  |  提交时间:2019/12/05
|
| Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station 期刊论文 TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 卷号: 54 作者: Bian, Kang; Liu, Jian; Xiao, Ming; Liu, Zhenping 收藏  |  浏览/下载:3/0  |  提交时间:2019/12/05
|