CORC  > 兰州理工大学  > 兰州理工大学  > 土木工程学院
Concrete crack control in monolithic concrete bed construction of high-speed railway in northwest area of China
Tang, Xianxi2; Zhu, Yanpeng2; Tang, Xianzhou1; Guo, Wei3
2013
关键词concrete crack control northwest area monolithic concrete bed of high-speed railway
卷号405-408
DOI10.4028/www.scientific.net/AMM.405-408.3081
页码3081-+
英文摘要There were some reasons which cause the concrete cracks in monolithic concrete bed construction of high-speed railway. In this paper, combined with the specific situation of monolithic concrete bed construction of high-speed railway in northwest area of China, the states and causes of two kinds of cracks in monolithic concrete bed of high-speed railway were analyzed, the concrete cracking control measures were discussed from the concrete mixture ratio, construction technology and maintenance measures and other aspects, and the corresponding views were put forward. The study results had the important guiding significance on crack controls of concrete structure during the construction process of northwest area.
会议录PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4
会议录出版者TRANS TECH PUBLICATIONS LTD
会议录出版地KREUZSTRASSE 10, 8635 DURNTEN-ZURICH, SWITZERLAND
语种英语
WOS研究方向Engineering ; Materials Science
WOS记录号WOS:000339463301254
内容类型会议论文
源URL[http://119.78.100.223/handle/2XXMBERH/37024]  
专题土木工程学院
通讯作者Tang, Xianxi
作者单位1.Jinan Railway Adm, Jixi Track Maintenance Div, Jinan 250001, Peoples R China
2.Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China
3.Shandong Elect Power Engn Consulting Inst Co Ltd, Shanghai 250013, Peoples R China
推荐引用方式
GB/T 7714
Tang, Xianxi,Zhu, Yanpeng,Tang, Xianzhou,et al. Concrete crack control in monolithic concrete bed construction of high-speed railway in northwest area of China[C]. 见:.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace