Estimation of tissue construction cost from heat of combustion and organic nitrogen content
K. WILLIAMS ; F. PERCIVAL ; J. MERINO ; H. A. MOONEY
刊名Plant, Cell & Environment
1987
卷号10期号:9页码:725-734
关键词Lepechinia catycina(Benth.) Epl. Diplacus aurantiacus(Curtis) Jeps. Heteromeles arbulifolia(Ait.) Roem. production value glucose equivalent construction cost heal of combustion biosynthetic efficiency growth efficiency
中文摘要We present a method for estimating the construction costs of plant tissues from measurements of heat of combustion, ash content, and organic nitrogen content. The method predicts glucose equivalents, the amount of glucose required to provide carbon skeletons and reductant to synthesize a quantity of organic product. Glucose equivalents have previously been calculated from the elemental composition of tissue. We define construction cost as the amount of glucose required to provide carbon skeletons, reductant and ATP for synthesizing the organic compounds in a tissue via standard biochemical pathways. The fraction of the total construction cost of a compound or tissue (excluding costs of transporting compounds) that is reflected in its glucose equivalents is the biosynthetic efficiency (EB). This quantity varies between 0.84 and 0.95 for tissues with a wide range of compositions. Using the new method, total construction cost can be estimated to ± 6% of the value obtained from biochemical pathway analysis.

Construction costs of leaves of three chaparral species were estimated using the proposed method and compared to previously published values, derived using different methods. Agreement among methods was generally good. Differences were probably due to a combination of inaccuracy in the estimated biosynthetic efficiency and technical difficulties with biochemical analysis, one of the older methods of determining construction cost.

公开日期2013-11-15
内容类型期刊论文
源URL[http://ir.xtbg.org.cn/handle/353005/4761]  
专题西双版纳热带植物园_文献共享
推荐引用方式
GB/T 7714
K. WILLIAMS,F. PERCIVAL,J. MERINO,et al. Estimation of tissue construction cost from heat of combustion and organic nitrogen content[J]. Plant, Cell & Environment,1987,10(9):725-734.
APA K. WILLIAMS,F. PERCIVAL,J. MERINO,&H. A. MOONEY.(1987).Estimation of tissue construction cost from heat of combustion and organic nitrogen content.Plant, Cell & Environment,10(9),725-734.
MLA K. WILLIAMS,et al."Estimation of tissue construction cost from heat of combustion and organic nitrogen content".Plant, Cell & Environment 10.9(1987):725-734.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace