Task allocation and evaluation model for Holonic manufacturing system based on multi-agent system | |
Zhao, Fuqing1; Zhang, Qiuyu1; Wang, Lianxiang2 | |
2008 | |
会议日期 | June 25, 2008 - June 27, 2008 |
会议地点 | Chongqing, China |
关键词 | Clustering algorithms Competition Flexible manufacturing systems Intelligent agents Particle swarm optimization (PSO) Clustering mechanism Complex manufacturing Dynamic re-configuration Holonic manufacturing Holonic manufacturing system Model and algorithms Optimization algorithms Order forms |
DOI | 10.1109/WCICA.2008.4593720 |
页码 | 4906-4910 |
英文摘要 | With the development of market demands and pressures of competition, enterprise need to maintain highly flexible manufacturing system to cope with a complex manufacturing environment. The concept of Holonic Manufacturing Systems (HMS) is the key to meet future demands of highly dynamic production environments. In this paper, dynamic re-configuration and task allocation method with some constriction of holonic manufacturing systems (HMS) based on multi-agent system is proposed. A task-oriented clustering mechanism and a corresponding optimization algorithm are presented as an efficient approach to the holonic control in the HMS domain, a hybrid algorithm based on particle swarm optimization(PSO) for Holon task allocation is described to support the optimum organization of a holarchy. Simulation results show that the proposed model and algorithm are effective. © 2008 IEEE. |
会议录 | Proceedings of the World Congress on Intelligent Control and Automation (WCICA) |
会议录出版者 | Institute of Electrical and Electronics Engineers Inc. |
语种 | 英语 |
内容类型 | 会议论文 |
源URL | [http://ir.lut.edu.cn/handle/2XXMBERH/116918] |
专题 | 计算机与通信学院 国际合作处(港澳台办) |
作者单位 | 1.School of Computer and Communication Engineering, Lanzhou University of Technology, Lanzhou, Gansu 730050, China; 2.Institute of Software, Lanzhou University of Technology, Lanzhou, Gansu 730050, China |
推荐引用方式 GB/T 7714 | Zhao, Fuqing,Zhang, Qiuyu,Wang, Lianxiang. Task allocation and evaluation model for Holonic manufacturing system based on multi-agent system[C]. 见:. Chongqing, China. June 25, 2008 - June 27, 2008. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论