CORC  > 兰州理工大学  > 兰州理工大学  > 计算机与通信学院
A Novel Manufacturing Grid Scheduling Method and Its Implementation Based on Multi-Agent System
Zhao, Fuqing; Zhang, Qiuyu; Yanj, Yahong
2008
关键词manufacturing grid multi-agent scheduling Contract Net Protocol
页码1346-1350
英文摘要Manufacturing negotiation and scheduling problem are the key technology in improving efficiency in enterprise. In order to meet the multi-Qos requirement of the users in the manufacturing grid, a multi agent-based scheduling approach for the manufacturing grid based on the requirement of scheduling in manufacturing grid is put forward. Contract Net Protocol is adopted to the multi-agent cooperation and negotiation system. The communication and interaction mechanism are guarantee on the JADE and JGAP platform. Simulation result shows that the method is effective to the negotiation and scheduling problem in manufacturing grid.
会议录SEVENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III
会议录出版者CHINA UNIV GEOSCIENCES PRESS
会议录出版地388 LUMO ROAD, WUHAN, HUBEI 430074, PEOPLES R CHINA
语种英语
WOS研究方向Business & Economics ; Engineering ; Operations Research & Management Science
WOS记录号WOS:000261165501054
内容类型会议论文
源URL[http://119.78.100.223/handle/2XXMBERH/37944]  
专题计算机与通信学院
国际合作处(港澳台办)
作者单位Lanzhou Univ Technol, Sch Comp & Commun, Lanzhou 730050, Gansu, Peoples R China
推荐引用方式
GB/T 7714
Zhao, Fuqing,Zhang, Qiuyu,Yanj, Yahong. A Novel Manufacturing Grid Scheduling Method and Its Implementation Based on Multi-Agent System[C]. 见:.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace