Research on time and frequency transfer during PPP convergence with parameters correlation comparison | |
Ouyang, Mingjun1; Li, Junzhi1; Li, Wanqing1; Ge, Yulong2,3; Zhu, Xiangwei1; Chen, Zhengkun1; Dai, Zhiqiang1 | |
刊名 | MEASUREMENT |
2021-03-01 | |
卷号 | 173页码:10 |
关键词 | Time frequency transfer Precise point positioning Convergence period Parameter correlation Modified Allan variance |
ISSN号 | 0263-2241 |
DOI | 10.1016/j.measurement.2020.108597 |
英文摘要 | The PPP (Precise Point Positioning) has a quite long convergence time at the beginning of the positioning process or the scene that real-time data was interrupted to resume, and the positioning accuracy during the convergence period does not meet the requirements of high-precision applications. This paper studies the PPP method for time transfer and its accuracy and stability during the convergence time. Based on study the correlation between clock difference, coordinates and tropospheric parameters, the method of fixing coordinates was proposed. By the application of prior coordinate information, compared to the conventional method, with 83 stations, RMS(Root Mean Square) of clock improved range from 2.23% to 98.51% and STD (Standard Deviation) improved range from 10.13% to 92.56%; also, the time transfer accuracy was below 1 ns during the convergence period. When the modified Allan variance was adopted, the frequency stability of clock improved range from 0.55% to 30.28%, and improved up to 67.43%, which verified the improvement of frequency stability during the convergence period when prior information on coordinate was used. |
资助项目 | Key Special Projects of the National Key Research and Development Plan[2018YFB0505200] ; National Natural Science Foundation of China[61973328] ; National Natural Science Foundation of China[91938301] |
WOS关键词 | GPS |
WOS研究方向 | Engineering ; Instruments & Instrumentation |
语种 | 英语 |
出版者 | ELSEVIER SCI LTD |
WOS记录号 | WOS:000662225100024 |
资助机构 | Key Special Projects of the National Key Research and Development Plan ; Key Special Projects of the National Key Research and Development Plan ; National Natural Science Foundation of China ; National Natural Science Foundation of China ; Key Special Projects of the National Key Research and Development Plan ; Key Special Projects of the National Key Research and Development Plan ; National Natural Science Foundation of China ; National Natural Science Foundation of China ; Key Special Projects of the National Key Research and Development Plan ; Key Special Projects of the National Key Research and Development Plan ; National Natural Science Foundation of China ; National Natural Science Foundation of China ; Key Special Projects of the National Key Research and Development Plan ; Key Special Projects of the National Key Research and Development Plan ; National Natural Science Foundation of China ; National Natural Science Foundation of China |
内容类型 | 期刊论文 |
源URL | [http://210.72.145.45/handle/361003/10678] |
专题 | 中国科学院国家授时中心 |
通讯作者 | Ouyang, Mingjun; Zhu, Xiangwei |
作者单位 | 1.Sun Yat Sen Univ, Sch Elect & Commun Engn, Guangzhou 510006, Peoples R China 2.Chinese Acad Sci, Natl Time Serv Ctr, Xian 710600, Peoples R China 3.Univ Chinese Acad Sci, Beijing 100049, Peoples R China |
推荐引用方式 GB/T 7714 | Ouyang, Mingjun,Li, Junzhi,Li, Wanqing,et al. Research on time and frequency transfer during PPP convergence with parameters correlation comparison[J]. MEASUREMENT,2021,173:10. |
APA | Ouyang, Mingjun.,Li, Junzhi.,Li, Wanqing.,Ge, Yulong.,Zhu, Xiangwei.,...&Dai, Zhiqiang.(2021).Research on time and frequency transfer during PPP convergence with parameters correlation comparison.MEASUREMENT,173,10. |
MLA | Ouyang, Mingjun,et al."Research on time and frequency transfer during PPP convergence with parameters correlation comparison".MEASUREMENT 173(2021):10. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论