CORC  > 武汉岩土力学研究所  > 中科院武汉岩土力学所
A fast and precise methodology of creep master curve construction for geosynthetics based on stepped isothermal method (SIM)
Zhao, Yang1,2; Lu, Zheng1,3; Yao, Hailin1; Hu, Haixiang1; Li, Xiaoyong4; Tang, Yousheng5
刊名GEOTEXTILES AND GEOMEMBRANES
2021-08-01
卷号49期号:4页码:952-962
关键词Geosynthetics Creep test Accelerated creep test Stepped isothermal method (SIM)
ISSN号0266-1144
DOI10.1016/j.geotexmem.2021.01.005
英文摘要The variability of the virtual time of stepped isothermal method (SIM) was observed during the creep master curves construction of a new high-performance geosynthetics material, which led to the significant errors in predicting the long-term creep. After analyzing the process of construction, the difference in selecting the beginning and end segments is the reason causing the errors. Therefore, a set of computer-based routine was programmed to eliminate the errors. Based on the amount of data of SIM and conventional creep tests, the virtual time of each corresponding step, the curves of scaled creep data, and the comparison between these two creep data were obtained in the present study by the routine. They were used to study the influence of different beginning segments and end segments on the master creep curve. Overall, The 5% of elevated temperature step and 50% of the previous step is suggested to regard as the beginning segment and end segment respectively to obtain the more well-founded virtual time and more accurate creep curve. This study not only provides a reference for research focusing on accelerated creep tests but proposed a fast and accurate methodology to construct the creep master of SIM tests.
资助项目National Natural Science Foundation of China[42077262] ; National Natural Science Foundation of China[42077261] ; National Natural Science Foundation of China[41972294]
WOS研究方向Engineering ; Geology
语种英语
出版者ELSEVIER SCI LTD
WOS记录号WOS:000660113300003
内容类型期刊论文
源URL[http://119.78.100.198/handle/2S6PX9GI/27488]  
专题中科院武汉岩土力学所
作者单位1.Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan 430071, Peoples R China
2.Univ Chinese Acad Sci, Beijing 100049, Peoples R China
3.Hubei Key Lab Geoenvironm Engn, Wuhan 430071, Peoples R China
4.Changjiang Wuhan Waterway Bur, Wuhan 430010, Hubei, Peoples R China
5.China United Engn Co Ltd, Hangzhou 310052, Peoples R China
推荐引用方式
GB/T 7714
Zhao, Yang,Lu, Zheng,Yao, Hailin,et al. A fast and precise methodology of creep master curve construction for geosynthetics based on stepped isothermal method (SIM)[J]. GEOTEXTILES AND GEOMEMBRANES,2021,49(4):952-962.
APA Zhao, Yang,Lu, Zheng,Yao, Hailin,Hu, Haixiang,Li, Xiaoyong,&Tang, Yousheng.(2021).A fast and precise methodology of creep master curve construction for geosynthetics based on stepped isothermal method (SIM).GEOTEXTILES AND GEOMEMBRANES,49(4),952-962.
MLA Zhao, Yang,et al."A fast and precise methodology of creep master curve construction for geosynthetics based on stepped isothermal method (SIM)".GEOTEXTILES AND GEOMEMBRANES 49.4(2021):952-962.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace