CORC  > 湖南大学
Determination of maximum reclosure time for faulted single transmission line connecting small hydropower system with power grid
Liu, Guangye; Zeng, Ziqiang; Mao, Yi; Shi, Hailiang; Tang, Haijun; Hu, Feng
刊名Dianwang Jishu/Power System Technology
2012
卷号Vol.36 No.1页码:241-244
ISSN号1000-3673
URL标识查看原文
公开日期[db:dc_date_available]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/6508079
专题湖南大学
作者单位1.) College of Electrical and Information Engineering, Hunan University, Changsha 410082, Hunan Province, China
2.Changde Electric Power Bureau, Changde 415000, Hunan Province, China
推荐引用方式
GB/T 7714
Liu, Guangye,Zeng, Ziqiang,Mao, Yi,et al. Determination of maximum reclosure time for faulted single transmission line connecting small hydropower system with power grid[J]. Dianwang Jishu/Power System Technology,2012,Vol.36 No.1:241-244.
APA Liu, Guangye,Zeng, Ziqiang,Mao, Yi,Shi, Hailiang,Tang, Haijun,&Hu, Feng.(2012).Determination of maximum reclosure time for faulted single transmission line connecting small hydropower system with power grid.Dianwang Jishu/Power System Technology,Vol.36 No.1,241-244.
MLA Liu, Guangye,et al."Determination of maximum reclosure time for faulted single transmission line connecting small hydropower system with power grid".Dianwang Jishu/Power System Technology Vol.36 No.1(2012):241-244.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace