CORC  > 山东大学
Solving the Steelmaking-continuous Casting Production Scheduling Problem with Uncertain Processing Time under the TOU Electricity Price
Wang Guirong; Li Qiqiang
2017
会议名称Chinese Automation Congress (CAC)
会议日期OCT 20-22, 2017
关键词steelmaking-continuous casting complex technical route cross entropy time-of-use electricity price
页码1383-1388
收录类别CPCI-S
会议录2017 CHINESE AUTOMATION CONGRESS (CAC)
URL标识查看原文
内容类型会议论文
URI标识http://www.corc.org.cn/handle/1471x/6028883
专题山东大学
作者单位1.Minist Educ, Key Lab Bldg Renewable Energy Utilizat Technol, Jinan, Shandong, Peoples R China.
2.Shandong Univ, Sch Contr
推荐引用方式
GB/T 7714
Wang Guirong,Li Qiqiang. Solving the Steelmaking-continuous Casting Production Scheduling Problem with Uncertain Processing Time under the TOU Electricity Price[C]. 见:Chinese Automation Congress (CAC). OCT 20-22, 2017.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace