CORC  > 湖南大学
Virtual Monitoring of orthotropic steel deck using bridge weigh-in-motion algorithm: Case study
Zhang, LW; Zhao, H; OBrien, EJ; Shao, XD
刊名STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL
2019
卷号Vol.18 No.2页码:610-620
关键词Bridge weigh-in-motion bridge weigh-in-motion virtual monitoring orthotropic steel deck fatigue evaluation
ISSN号1475-9217
URL标识查看原文
公开日期[db:dc_date_available]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4610681
专题湖南大学
作者单位1.China Minsheng Drawin Technol Grp, Changsha, Hunan, Peoples R China
2.Hunan Univ, Coll Civil Engn, Key Lab Wind & Bridge Engn Hunan Prov, Changsha, Hunan, Peoples R China
3.Univ Coll Dublin, Sch Civil Struct & Environm Engn, Dublin, Ireland
推荐引用方式
GB/T 7714
Zhang, LW,Zhao, H,OBrien, EJ,et al. Virtual Monitoring of orthotropic steel deck using bridge weigh-in-motion algorithm: Case study[J]. STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL,2019,Vol.18 No.2:610-620.
APA Zhang, LW,Zhao, H,OBrien, EJ,&Shao, XD.(2019).Virtual Monitoring of orthotropic steel deck using bridge weigh-in-motion algorithm: Case study.STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL,Vol.18 No.2,610-620.
MLA Zhang, LW,et al."Virtual Monitoring of orthotropic steel deck using bridge weigh-in-motion algorithm: Case study".STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL Vol.18 No.2(2019):610-620.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace