CORC  > 大连理工大学
200 m level high panel rock fill dam anti-seepage structure bodydesigning method, involves setting single-level platform position in construction joint, where heightof rock body region is higher than height of bi-direction geogrid.
LI H YAN Z YANG Y YANG Z ZHAO J ZHA
2016
公开日期2016-02-03
URL标识查看原文
申请日期2015-11-29
内容类型专利
URI标识http://www.corc.org.cn/handle/1471x/4381267
专题大连理工大学
作者单位UNIV DALIAN TECHNOLOGY CHINA INST WATER RESOURCES & HYDROPOWER CHINA INST WATER RESOURCES & HYDROPOWER UNIV DALIAN TECHNOLOGY (UYDA-C
推荐引用方式
GB/T 7714
LI H YAN Z YANG Y YANG Z ZHAO J ZHA. 200 m level high panel rock fill dam anti-seepage structure bodydesigning method, involves setting single-level platform position in construction joint, where heightof rock body region is higher than height of bi-direction geogrid.. 2016-01-01.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace