200 m level high panel rock fill dam anti-seepage structure bodydesigning method, involves setting single-level platform position in construction joint, where heightof rock body region is higher than height of bi-direction geogrid. | |
LI H YAN Z YANG Y YANG Z ZHAO J ZHA | |
2016 | |
公开日期 | 2016-02-03 |
URL标识 | 查看原文 |
申请日期 | 2015-11-29 |
内容类型 | 专利 |
URI标识 | http://www.corc.org.cn/handle/1471x/4381267 |
专题 | 大连理工大学 |
作者单位 | UNIV DALIAN TECHNOLOGY CHINA INST WATER RESOURCES & HYDROPOWER CHINA INST WATER RESOURCES & HYDROPOWER UNIV DALIAN TECHNOLOGY (UYDA-C |
推荐引用方式 GB/T 7714 | LI H YAN Z YANG Y YANG Z ZHAO J ZHA. 200 m level high panel rock fill dam anti-seepage structure bodydesigning method, involves setting single-level platform position in construction joint, where heightof rock body region is higher than height of bi-direction geogrid.. 2016-01-01. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论