CORC  > 武汉大学
Efficient operation of the fourth Huaian pumping station in east route of South-to-North Water Diversion Project
Zhuan, Xiangtao; Zhang, Lei; Li, Wei; Yang, Fei
刊名INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS
2018
卷号98
关键词Optimal scheduling Dynamic programming Pumping station Cost efficiency South-to-North Water Diversion Project
ISSN号0142-0615
DOI10.1016/j.ijepes.2017.10.041
URL标识查看原文
收录类别SCIE ; EI
语种英语
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4090267
专题武汉大学
推荐引用方式
GB/T 7714
Zhuan, Xiangtao,Zhang, Lei,Li, Wei,et al. Efficient operation of the fourth Huaian pumping station in east route of South-to-North Water Diversion Project[J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2018,98.
APA Zhuan, Xiangtao,Zhang, Lei,Li, Wei,&Yang, Fei.(2018).Efficient operation of the fourth Huaian pumping station in east route of South-to-North Water Diversion Project.INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,98.
MLA Zhuan, Xiangtao,et al."Efficient operation of the fourth Huaian pumping station in east route of South-to-North Water Diversion Project".INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS 98(2018).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace