Discrete element modeling of a cross-river tunnel under subway train operation during peak and off-peak periods | |
Zhang, Zhihua; Zhang, Xiedong; Cui, Yifei*; Qiu, Hongsheng | |
刊名 | Arabian Journal of Geosciences |
2019 | |
卷号 | 12期号:3页码:102- |
关键词 | Cross-river tunnel Discrete element method Irregular vibration levels Peak load Radial displacement Subway |
ISSN号 | 1866-7511 |
DOI | 10.1007/s12517-019-4279-2 |
URL标识 | 查看原文 |
WOS记录号 | WOS:000457365800011 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3388578 |
专题 | 武汉理工大学 |
作者单位 | 1.[Zhang, Xiedong 2.Qiu, Hongsheng 3.Zhang, Zhihua] Wuhan Univ Technol, Sch Transportat, Wuhan 430063, Hubei, Peoples R China. |
推荐引用方式 GB/T 7714 | Zhang, Zhihua,Zhang, Xiedong,Cui, Yifei*,et al. Discrete element modeling of a cross-river tunnel under subway train operation during peak and off-peak periods[J]. Arabian Journal of Geosciences,2019,12(3):102-. |
APA | Zhang, Zhihua,Zhang, Xiedong,Cui, Yifei*,&Qiu, Hongsheng.(2019).Discrete element modeling of a cross-river tunnel under subway train operation during peak and off-peak periods.Arabian Journal of Geosciences,12(3),102-. |
MLA | Zhang, Zhihua,et al."Discrete element modeling of a cross-river tunnel under subway train operation during peak and off-peak periods".Arabian Journal of Geosciences 12.3(2019):102-. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论