CORC  > 武汉理工大学
A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold
Lei, Deming*; Li, Ming; Wang, Ling
刊名IEEE Transactions on Cybernetics
2019
卷号49期号:3页码:1097-1109
关键词Energy consumption threshold flexible job shop scheduling problem (FJSP) imperialist competitive algorithm (ICA) two-phase meta-heuristic (TPM) variable neighborhood search (VNS)
ISSN号2168-2267
DOI10.1109/TCYB.2018.2796119
URL标识查看原文
WOS记录号WOS:000458655900031
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3379286
专题武汉理工大学
作者单位1.[Li, Ming
2.Lei, Deming] Wuhan Univ Technol, Sch Automat, Wuhan 430070, Hubei, Peoples R China.
推荐引用方式
GB/T 7714
Lei, Deming*,Li, Ming,Wang, Ling. A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold[J]. IEEE Transactions on Cybernetics,2019,49(3):1097-1109.
APA Lei, Deming*,Li, Ming,&Wang, Ling.(2019).A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold.IEEE Transactions on Cybernetics,49(3),1097-1109.
MLA Lei, Deming*,et al."A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold".IEEE Transactions on Cybernetics 49.3(2019):1097-1109.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace