Transmission lines de-icing optimal scheduling considering system risk | |
Hou, Yushen; Wang, Xiuli; Duan, Jie; Guo, Jingli | |
刊名 | Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering |
2014 | |
卷号 | 34期号:[db:dc_citation_issue]页码:6101-6108 |
关键词 | Component outage model Expected energy not supplied Forced outage rates Integer optimization Load-strength interference Objective functions Optimal scheduling Wind load |
ISSN号 | 0258-8013 |
DOI | [db:dc_identifier_doi] |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3289094 |
专题 | 西安交通大学 |
推荐引用方式 GB/T 7714 | Hou, Yushen,Wang, Xiuli,Duan, Jie,et al. Transmission lines de-icing optimal scheduling considering system risk[J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,2014,34([db:dc_citation_issue]):6101-6108. |
APA | Hou, Yushen,Wang, Xiuli,Duan, Jie,&Guo, Jingli.(2014).Transmission lines de-icing optimal scheduling considering system risk.Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,34([db:dc_citation_issue]),6101-6108. |
MLA | Hou, Yushen,et al."Transmission lines de-icing optimal scheduling considering system risk".Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering 34.[db:dc_citation_issue](2014):6101-6108. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论