CORC  > 西安交通大学
Transmission lines de-icing optimal scheduling considering system risk
Hou, Yushen; Wang, Xiuli; Duan, Jie; Guo, Jingli
刊名Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering
2014
卷号34期号:[db:dc_citation_issue]页码:6101-6108
关键词Component outage model Expected energy not supplied Forced outage rates Integer optimization Load-strength interference Objective functions Optimal scheduling Wind load
ISSN号0258-8013
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3289094
专题西安交通大学
推荐引用方式
GB/T 7714
Hou, Yushen,Wang, Xiuli,Duan, Jie,et al. Transmission lines de-icing optimal scheduling considering system risk[J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,2014,34([db:dc_citation_issue]):6101-6108.
APA Hou, Yushen,Wang, Xiuli,Duan, Jie,&Guo, Jingli.(2014).Transmission lines de-icing optimal scheduling considering system risk.Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,34([db:dc_citation_issue]),6101-6108.
MLA Hou, Yushen,et al."Transmission lines de-icing optimal scheduling considering system risk".Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering 34.[db:dc_citation_issue](2014):6101-6108.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace