Optimal Operation of Cascade Hydropower Plants in Deregulated Electricity Market: A Case Study of Lancang River in China | |
Miao, Shumin; Luo, Bin; Shen, Jianjian; Cheng, Chuntian | |
2017 | |
会议名称 | 17th Annual World Environmental and Water Resources Congress |
会议日期 | 2017-05-21 |
会议地点 | Sacramento, CA |
关键词 | Power market Cascade hydropower plants Operation scheduling |
页码 | 453-463 |
会议录 | 17th Annual World Environmental and Water Resources Congress |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3285561 |
专题 | 大连理工大学 |
作者单位 | Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China. |
推荐引用方式 GB/T 7714 | Miao, Shumin,Luo, Bin,Shen, Jianjian,et al. Optimal Operation of Cascade Hydropower Plants in Deregulated Electricity Market: A Case Study of Lancang River in China[C]. 见:17th Annual World Environmental and Water Resources Congress. Sacramento, CA. 2017-05-21. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论