A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains | |
Du, Mu; Kong, Nan; Hu, Xiangpei | |
刊名 | INFOR |
2019 | |
卷号 | 57页码:296-313 |
关键词 | Integrated production and distribution scheduling make-to-order supply chain local search heuristic |
ISSN号 | 0315-5986 |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3231419 |
专题 | 大连理工大学 |
作者单位 | 1.Southeast Univ, Sch Econ & Management, 2 Sipailou, Nanjing 210096, Jiangsu, Peoples R China. 2.Dalian Univ Technol, Inst Syst Engn, Dalian, Peoples R China. 3.Purdue Univ, Weldon Sch Biomed Engn, W Lafayette, IN 47907 USA. 4.Dalian Univ Technol, Inst Syst Engn, Dalian, Peoples R China. |
推荐引用方式 GB/T 7714 | Du, Mu,Kong, Nan,Hu, Xiangpei. A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains[J]. INFOR,2019,57:296-313. |
APA | Du, Mu,Kong, Nan,&Hu, Xiangpei.(2019).A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains.INFOR,57,296-313. |
MLA | Du, Mu,et al."A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains".INFOR 57(2019):296-313. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论