A mixed integer linear programming model for unit commitment of thermal plants with peak shaving operation aspect in regional power grid lack of flexible hydropower energy | |
Feng, Zhong-kai; Niu, Wen-jing; Wang, Wen-chuan; Zhou, Jian-zhong; Cheng, Chun-tian | |
刊名 | ENERGY |
2019 | |
卷号 | 175页码:618-629 |
关键词 | Mixed integer linear programming (MILP) Thermal power plants Unit commitment Peak shaving operation Regional power grid |
ISSN号 | 0360-5442 |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3218694 |
专题 | 大连理工大学 |
作者单位 | 1.Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China. 2.Changjiang Water Resources Commiss, Bur Hydrol, Wuhan 430010, Hubei, Peoples R China. 3.North China Univ Water Resources & Elect Power, Sch Water Conservancy, Zhengzhou 450046, Henan, Peoples R China. 4.Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China. |
推荐引用方式 GB/T 7714 | Feng, Zhong-kai,Niu, Wen-jing,Wang, Wen-chuan,et al. A mixed integer linear programming model for unit commitment of thermal plants with peak shaving operation aspect in regional power grid lack of flexible hydropower energy[J]. ENERGY,2019,175:618-629. |
APA | Feng, Zhong-kai,Niu, Wen-jing,Wang, Wen-chuan,Zhou, Jian-zhong,&Cheng, Chun-tian.(2019).A mixed integer linear programming model for unit commitment of thermal plants with peak shaving operation aspect in regional power grid lack of flexible hydropower energy.ENERGY,175,618-629. |
MLA | Feng, Zhong-kai,et al."A mixed integer linear programming model for unit commitment of thermal plants with peak shaving operation aspect in regional power grid lack of flexible hydropower energy".ENERGY 175(2019):618-629. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论