CORC  > 天津大学
The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China
Yu Zeng; Weidong Chen
刊名Energies
2019
卷号Vol.12 No.18页码:3520
关键词photovoltaic power generation build operate transfer concession period China
ISSN号1996-1073
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2902446
专题天津大学
作者单位College of Management and Economics, Tianjin University, Tianjin 300072, China College of Management and Economics, Tianjin University, Tianjin 300072, China
推荐引用方式
GB/T 7714
Yu Zeng,Weidong Chen. The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China[J]. Energies,2019,Vol.12 No.18:3520.
APA Yu Zeng,&Weidong Chen.(2019).The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China.Energies,Vol.12 No.18,3520.
MLA Yu Zeng,et al."The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China".Energies Vol.12 No.18(2019):3520.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace