The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China | |
Yu Zeng; Weidong Chen | |
刊名 | Energies |
2019 | |
卷号 | Vol.12 No.18页码:3520 |
关键词 | photovoltaic power generation build operate transfer concession period China |
ISSN号 | 1996-1073 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2902446 |
专题 | 天津大学 |
作者单位 | College of Management and Economics, Tianjin University, Tianjin 300072, China College of Management and Economics, Tianjin University, Tianjin 300072, China |
推荐引用方式 GB/T 7714 | Yu Zeng,Weidong Chen. The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China[J]. Energies,2019,Vol.12 No.18:3520. |
APA | Yu Zeng,&Weidong Chen.(2019).The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China.Energies,Vol.12 No.18,3520. |
MLA | Yu Zeng,et al."The Determination of Concession Period for Build-Operate-Transfer Solar Photovoltaic Power Project under Policy Incentives: A Case Study of China".Energies Vol.12 No.18(2019):3520. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论