A min-max solution to optimise planned lead time in a remanufacturing system | |
Liu, Biyu; Chen, Weida; Segerstedt, Anders; Yang, Haidong; Zhang, Qinhong | |
刊名 | INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH |
2019 | |
卷号 | 26页码:485-506 |
关键词 | make-to-order production optimisation planned lead time partial distribution remanufacturing |
ISSN号 | 0969-6016 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2887616 |
专题 | 福州大学 |
推荐引用方式 GB/T 7714 | Liu, Biyu,Chen, Weida,Segerstedt, Anders,et al. A min-max solution to optimise planned lead time in a remanufacturing system[J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH,2019,26:485-506. |
APA | Liu, Biyu,Chen, Weida,Segerstedt, Anders,Yang, Haidong,&Zhang, Qinhong.(2019).A min-max solution to optimise planned lead time in a remanufacturing system.INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH,26,485-506. |
MLA | Liu, Biyu,et al."A min-max solution to optimise planned lead time in a remanufacturing system".INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH 26(2019):485-506. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论