CURRENT STATUS AND FUTURE PROJECTS OF THE ITHEMBA LABS
J.L. Conradie ; L. Anthony ; A.H. Botha ; J.G. de Villiers ; J.L.G. Delsink ; W. Duckitt ; D.T. Fourie
2010-09-10
关键词Cyclotron Facilities Epics Ecr
英文摘要The cyclotron facilities at iThemba LABS have been
utilized for isotope production, nuclear physics research,
proton therapy and neutron therapy for nearly 25 years.
The upgrading and replacing of redundant systems is
essential, in order to keep the interruptions due to
equipment failure to a minimum. The computer control
system will be replaced by an Experimental Physics and
Industrial Control System (EPICS) and the analogue lowlevel
RF control systems will be replaced with digital
systems. The Minimafios ECR ion source is being
replaced with an ECR source that was used at the former
Hahn Meitner Institute. Another source, based on the
design of the Grenoble test source, will be commissioned
later this year. To increase the production of radioisotopes,
the 66 MeV proton beam is split with an electrostatic
channel to deliver two beams simultaneously. The first
results with the beam splitter will be reported. A phase
measuring system for the separated-sector cyclotron,
comprising 21 fixed probes, has been installed. The
progress of these projects and the status of the facilities
will be presented. Plans for new facilities for proton
therapy and radioactive beams will also be discussed.
语种英语
内容类型研究报告
源URL[http://ir.imp.cas.cn/handle/113462/8468]  
专题近代物理研究所_近代物理研究所知识存储(2010之前)
推荐引用方式
GB/T 7714
J.L. Conradie,L. Anthony,A.H. Botha,et al. CURRENT STATUS AND FUTURE PROJECTS OF THE ITHEMBA LABS. 2010.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace