CORC  > 北京大学  > 地球与空间科学学院
Studies of the reinjection tests in basement geothermal reservoir, Tianjin, China
Kun, Wang
2003
英文摘要By the end of 2001, 196 geothermal production wells and 12 reinjection wells had been completed in Tianjin. Annual fluid production is 22 million tons, of which 1.7 million tons are reinjected. The water level is 40 to 100m deep and the annual drawdown rate is 6 to 9 meters. This paper examines a reinjection test in WR45 production/reinjection doublet system. No temperature changes have been observed so far in the neighboring production wells. Naturally, we expect the reinjection will eventually cool the reservoir. Tracer tests are consequently very important for estimating fluid transport paths and effective fluid volumes so that future reservoir cooling arising from reinjection can be estimated.; EI; 0
语种英语
内容类型其他
源URL[http://ir.pku.edu.cn/handle/20.500.11897/329296]  
专题地球与空间科学学院
推荐引用方式
GB/T 7714
Kun, Wang. Studies of the reinjection tests in basement geothermal reservoir, Tianjin, China. 2003-01-01.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace