CORC  > 过程工程研究所  > 中国科学院过程工程研究所
Pilot Plant Test on the Recovery of Valuable Metals from Pyrite Cinder by a Combined Process Based on Chlorinating Roasting
Sun, Jian-Wei1,2; Han, Pei-Wei3; Liu, Qing1; Ding, Jian3; Qian, Peng3; Ye, Shu-Feng3
刊名TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS
2019-04-01
卷号72期号:4页码:1053-1061
关键词Pyrite cinder Valuable metals Combined process Chlorinating roasting
ISSN号0972-2815
DOI10.1007/s12666-019-01580-9
英文摘要A combined process based on the chlorinating roasting was developed in the present paper for the recovery of valuable metals from pyrite cinder, which contained the chlorinating roasting of pyrite cinder mixed with chlorinating agent in the rotary kiln, the collection of chlorinating dust and flue gas, the recovery of Au, Cu, Pb and Zn from the collection through hydrochloric acid leaching, and the recovery of Au from the acid leaching residue through cyanide leaching. Pilot plant test was carried out. The results showed that most of the comprehensive recovery rates of valuable metals were larger than 50% by using the combined process based on the chlorinating roasting, which could prove that the process was promising and helpful to increase the resource utilization rate and reduce the environmental pollution.
WOS关键词CALCIUM-CHLORIDE ; GOLD ; KINETICS ; REMOVAL
WOS研究方向Metallurgy & Metallurgical Engineering
语种英语
出版者SPRINGER INDIA
WOS记录号WOS:000462035400021
内容类型期刊论文
源URL[http://ir.ipe.ac.cn/handle/122111/28267]  
专题中国科学院过程工程研究所
通讯作者Han, Pei-Wei
作者单位1.Univ Sci & Technol Beijing, State Key Lab Adv Met, Beijing 100083, Peoples R China
2.Zhaojin Min Ind Co Ltd, Zhaoyuan 265400, Peoples R China
3.Chinese Acad Sci, Inst Proc Engn, State Key Lab Multiphase Complex Syst, Beijing 100190, Peoples R China
推荐引用方式
GB/T 7714
Sun, Jian-Wei,Han, Pei-Wei,Liu, Qing,et al. Pilot Plant Test on the Recovery of Valuable Metals from Pyrite Cinder by a Combined Process Based on Chlorinating Roasting[J]. TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS,2019,72(4):1053-1061.
APA Sun, Jian-Wei,Han, Pei-Wei,Liu, Qing,Ding, Jian,Qian, Peng,&Ye, Shu-Feng.(2019).Pilot Plant Test on the Recovery of Valuable Metals from Pyrite Cinder by a Combined Process Based on Chlorinating Roasting.TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS,72(4),1053-1061.
MLA Sun, Jian-Wei,et al."Pilot Plant Test on the Recovery of Valuable Metals from Pyrite Cinder by a Combined Process Based on Chlorinating Roasting".TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS 72.4(2019):1053-1061.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace