Recent experience from NSLS-II commissioning, operations and beam studies 
Timur Shaftan
2017-11-06
关键词创新论坛 279期
英文摘要
“NSLS-II accelerator systems have been commissioned in 2014 and now operating at 350 mA with horizontal emittance of 1 nm rad. 20 beam lines are taking synchrotron radiation beams at the rate of 4750 hours a year.
In this presentation the speaker will discuss milestones of beam commissioning and increasing performance of the NSLS-II injector and storage ring. Findings from recent beam studies and advances in accelerator physics will be presented.”
内容类型影音
源URL[http://ir.ihep.ac.cn/handle/311005/263571]  
专题高能物理研究所_管理与技术支持_多媒体_科技创新论坛
推荐引用方式
GB/T 7714
Timur Shaftan. Recent experience from NSLS-II commissioning, operations and beam studies . 2017.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace