Improved heuristic algorithm for modern industrial production scheduling
Pan FC(潘福成)2; Jiang, Yongqing1; Wang TR(王天然); Qiao HC(乔红超); Zhao JB(赵吉宾)
2017
会议名称9th International Conference on Modelling, Identification and Control, ICMIC 2017
会议日期July 10-12, 2017
会议地点Kunming, China
关键词Production Management Modern Industrial Heuristic Scheduling
页码1080-1084
通讯作者Jiang, Yongqing
中文摘要Scheduling is one of the core links of modern industrial production. Scheduling needs to be designed according to the characteristics of the production line. The basic core work is to process the task according to the processing process to arrange its production and processing process. In this paper, an improved heuristic industrial production scheduling method is proposed to solve the scheduling system problem with multiple scheduling tasks, multiple processes, multiple stations, multiple constraints and rules. This method specifies the processing equipment, start time and completion time for each process of the production task. The application method shows that the proposed method can improve the automation and intelligence level of the scheduling process, improve the utilization rate of equipment and other production resources, and give full play to the enterprise production capacity.
收录类别EI
产权排序2
会议录Proceedings of 2017 9th International Conference On Modelling, Identification and Control, ICMIC 2017
会议录出版者IEEE
会议录出版地New York
语种英语
ISBN号978-1-5090-6573-8
内容类型会议论文
源URL[http://ir.sia.cn/handle/173321/22421]  
专题沈阳自动化研究所_装备制造技术研究室
通讯作者Zhao JB(赵吉宾)
作者单位1.Master Stud. in Chongqing University, Chongqing, China
2.Shenyang Institute of Automation, China
推荐引用方式
GB/T 7714
Pan FC,Jiang, Yongqing,Wang TR,et al. Improved heuristic algorithm for modern industrial production scheduling[C]. 见:9th International Conference on Modelling, Identification and Control, ICMIC 2017. Kunming, China. July 10-12, 2017.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace