Acceptance tests of the BEPC II RF transmitter and the circulator
Pan WM(潘卫民); Wang H(王昊); Zhao GY(赵光远); Wang GW(王光伟); Sun Y(孙毅); Lei G(雷革); Ma Q(马强); Lin HY(林海英); Li JG(李建国); Zhang JT(张锦堂)
刊名HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION
2006
卷号30期号:7页码:688-692
关键词BEPC II RF transmitter circulator acceptance test technical parameters and performance
通讯作者Chinese Acad Sci, Inst High Energy Phys, Beijing 100049, Peoples R China
英文摘要The high power RF transmitter and the circulator with 500MHz/250kW which will be operated in Beijing Electron-Positron Collider Upgrade (BEPC II) project have been installed on site, and adjustments and acceptance test have been finished, which is the first transmitter system of 500MHz/250kW in China. In this paper, the test principle and all measurements as well as commissioning result in the acceptance test are introduced in details, and the actual machine technical parameters and performance are presented. An acceptance test conclusion by comparing with the design requirements is given.
学科主题Physics
类目[WOS]Physics, Nuclear ; Physics, Particles & Fields
研究领域[WOS]Physics
原文出处SCI
语种英语
WOS记录号WOS:000238854600022
内容类型期刊论文
源URL[http://ir.ihep.ac.cn/handle/311005/238273]  
专题高能物理研究所_加速器中心
作者单位中国科学院高能物理研究所
推荐引用方式
GB/T 7714
Pan WM,Wang H,Zhao GY,et al. Acceptance tests of the BEPC II RF transmitter and the circulator[J]. HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION,2006,30(7):688-692.
APA 潘卫民.,王昊.,赵光远.,王光伟.,孙毅.,...&Zhang, JT.(2006).Acceptance tests of the BEPC II RF transmitter and the circulator.HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION,30(7),688-692.
MLA 潘卫民,et al."Acceptance tests of the BEPC II RF transmitter and the circulator".HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION 30.7(2006):688-692.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace